Leonardo Pulles
AI-generated interim visual of potable water infrastructure in mountainous terrain
Back to projects
Water InfrastructureSite SupervisionSetting Out / QA-QC

Julio Andrade / Huaca Potable Water System

Location
Carchi, Ecuador
Period
2021-2023
Role
Site Engineer / Resident Engineer
Typology
Potable water infrastructure
Status
Completed
Network
Approx. 15 km
Residents
15,000+
Project value
Approx. €380k
Design flow
65 l/s
Allowance
180 l/hab/day

Challenge

Restore and strengthen water supply infrastructure after damage caused by the Chingual River flood event, while maintaining service continuity for communities.

Technical contribution

  1. 01Supervised pipe laying, groundworks, tie-ins and site execution.
  2. 02Verified line, level and gradient during installation.
  3. 03Coordinated inspections, QA/QC checkpoints and technical records.
  4. 04Supported continuity of service through temporary and permanent infrastructure decisions.
  5. 05Maintained site diary, progress records and as-built information.

Visual archive

Temporary reference imagery.

These visuals support the portfolio layout until approved real photography is added.